House Construction Checklist: 8 Stages, the Inspections at Each One and What to Check Yourself

A stage-by-stage house construction checklist for owners: what happens at each of the eight stages, which inspections must happen before work is covered, what to photograph and the documents to collect before you move in.

Block house under construction with scaffolding
FitOnear may earn a commission from qualifying purchases. Our recommendations remain independent.
Ffitonear1/7 · Build checklist
Tap to start →

Check it before it's covered

Block house under construction with scaffolding

Most building mistakes get buried. Here is how to catch them first.

Read the full guide ↓

Tap the sides or swipe to move · hold to pause · tap the half-circle icon to change the look

Building a house is a sequence of decisions that get buried. The steel in the footings disappears under concrete, the pipes under the slab, the wiring behind plaster. Every one of those things is cheap to fix while it is visible and expensive once it is covered. This checklist walks through the eight stages of building a house from the owner’s side: what happens at each stage, where an inspector has to look before work continues, what you should check and photograph yourself, and the papers to collect before you move in.

Quick answer

A house goes up in eight stages: preparation, site and setting out, footings, foundation and slab, structure and roof, rough-ins, insulation and finishes, and final handover. The stages that need an inspection before work is covered are usually the footings, the foundation and slab, the rough-in services and the insulation, followed by a final inspection before anyone moves in. In the US these are set out in the International Residential Code (section R109); in England you must give building control notice before starting and at least a day before covering foundations, damp-proofing and the oversite. Check your own authority’s list, and photograph every stage before it is hidden.

The 8 stages of building a house at a glance

StageWhat happensInspection or hold pointYou photograph or collect
1. Before you signBrief, design, soil test, approvals, contract, budgetPermits and approved drawings in handApprovals, contract, insurance, payment schedule
2. Site and setting outClearing, temporary power and water, pegs for the house cornersNotify the start; check pegs against setbacksPhotos of pegs and boundary marks
3. FootingsTrenches dug, steel placedHold: inspected before concreteTrench depth, steel, spacers; concrete delivery tickets
4. Foundation and slabFoundation walls, under-slab drains and pipes, damp-proofing, slabHold: inspected before backfill or coveringDrain runs, membrane laps, pipe positions with a tape in shot
5. Walls, frame and roofMasonry or frame, floors, roof, windows and doorsFrame inspection after rough-ins are approved (US)Lintels, roof fixings, window flashing
6. Rough-insPlumbing, drainage, wiring, ducts, gasHold: inspected and tested before walls closeEvery wall and ceiling, room by room, before boarding
7. Insulation and finishesInsulation, plaster or drywall, tiling, kitchen and bathroomsHold where required: insulation before cover; shower waterproofing testInsulation in walls and roof; waterproofing before tiles
8. Final and handoverExternal works, testing, cleaning, snaggingFinal inspection or completion certificate before moving inCertificates, warranties, manuals, as-built drawings
House construction checklist: eight stages and the hold pointsEight stages of building a house: 1 before you sign; 2 site and setting out, notify the start; 3 footings, hold point, steel checked before concrete; 4 foundation and slab, hold point, drains and damp-proofing checked before cover; 5 walls, frame and roof; 6 rough-ins, hold point, pipes, wiring, ducts and gas inspected before walls close; 7 insulation and finishes, hold point; 8 final inspection and handover. Rule: never cover work until it has been checked and photographed.FITONEAR · HOME & ARCHITECTUREHouse construction checklist: 8 stagesThe rule that saves the most money: never let work be covered until it has been checked and photographed.1Before you signBrief, budget + contingency,soil test, approvals, contract2Site and setting outCheck pegs against setbacks;site safety, water and powerNOTIFY START3FootingsTrench dug, steel tied andchecked before any concreteHOLD POINT4Foundation and slabDrains, damp-proofing andmembrane inspected firstHOLD POINT5Walls, frame and roofStructure up, then make itweathertight: roof, windows6Rough-insPipes, wiring, ducts and gasinspected before walls closeHOLD POINT7Insulation and finishesInsulation checked; showerwaterproofing tested firstHOLD POINT8Final and handoverFinal inspection, snag list,certificates, then move inSIGN-OFFHOLD POINT = book the inspection and wait for approval before the next trade covers the work. Stages and notice periods vary by country and city.fitonear.com · Sources: International Residential Code R109 (US); Planning Portal building control notices (England). Not to scale.
FitOnear diagram. Your local authority’s inspection list is the one that counts: ask for it when your permit or approval is issued.

Stage 1: Before you sign anything

The cheapest stage to change your mind is before a contract exists. Have these in hand first:

  • A written brief and room schedule. Know what you are building and roughly how big it is. The Home Planner turns your plot and family into a room schedule and floor area.
  • A budget with a contingency. Price by built area, and keep money aside for surprises in the ground. See the home building cost breakdown for where the money usually goes.
  • A soil or site investigation. Ground conditions decide the foundation; our guide to types of house foundations explains why.
  • Approvals and approved drawings. Planning or zoning approval and a building permit or building control approval, with the drawings they were issued against.
  • A written contract. Scope, specification, price, payment stages tied to completed work (not dates), programme, variations process, defects period and insurance.
  • The inspection list from your authority. Ask which stages they need to see and how much notice they want. Give a copy to your builder.

Stage 2: Site preparation and setting out

  • Notify the start if your authority requires it. In England, building control must be told at least two days before work begins.
  • Check the pegs or profile boards for the house corners against the approved site plan: distance to each boundary (setbacks), the road side and the finished floor level.
  • Confirm temporary water, power, site access, fencing and where materials will be stored.
  • Photograph the pegs with a tape measure in shot. A house set out a metre wrong is a very hard problem to fix later.

Stage 3: Footings

The US International Residential Code requires the footing inspection once the trenches are dug and any reinforcing steel is in place, before the concrete is poured. England’s rules ask for notice before covering the foundation excavation. Either way, this is your first hold point.

  • Trenches dug to the depth and width on the drawings, on firm ground, with no water or loose soil in the bottom.
  • Steel the right size, lapped and tied, and lifted off the ground on spacers so concrete can surround it.
  • Inspector’s approval recorded before the concrete truck is booked.
  • Keep the concrete delivery tickets: they show the mix that actually arrived.

Stage 4: Foundation, drains and slab

Under the IRC the foundation inspection comes once anchor bolts are set and before any framing or backfill. In England, building control needs at least a day’s notice before the foundation, any damp-proof course and the concrete or material laid over the site are covered. Under-slab drains and pipes are inspected and usually tested here too.

  • Drain runs at the correct fall, bedded properly and tested before they are buried.
  • Damp-proof membrane continuous, with overlaps taped, and no tears around pipes.
  • Pipe and duct positions match the kitchen and bathroom layout. Measure them from two walls.
  • Photograph every pipe position with a tape in the shot. You will want these photos when you drill a hole in five years.

Stage 5: Walls, frame and roof

The goal of this stage is a weathertight shell: structure, roof, windows and external doors. Brick, block and frame houses go up differently (our brick vs concrete block guide compares them), and the roof type affects how fast you can close the house in (see types of roofs).

  • Window and door openings in the right places and sizes before frames are ordered.
  • Lintels or beams over openings as specified, with the correct bearing at each end.
  • Roof structure tied down to the walls, and the roof covered quickly so finishes don’t get wet.
  • Window flashing and seals in place before the walls are rendered or clad.

Stage 6: Rough-ins (the most important photos you will take)

Rough-ins are the pipes, drains, wiring, ducts and gas lines that end up inside walls, floors and ceilings. Under the IRC they are inspected before they are concealed and before the frame inspection. This is the stage owners most often regret not checking.

  • Walk every room with the drawings: sockets, switches, lights, data points and the AC positions where you want them.
  • Kitchen and bathroom pipe positions match the chosen fittings and cabinets.
  • Pressure tests on water and gas lines passed and recorded.
  • Photograph every wall and ceiling, room by room, before boarding or plaster. Label the photos by room.

Stage 7: Insulation and finishes

  • Insulation in walls and roof as specified, with no gaps at corners, and inspected where your authority requires it before it is covered.
  • Shower and wet-room waterproofing tested (flood test) before tiles go down.
  • Kitchen and bathroom fit-out against the agreed layout; check clearances using our standard room sizes guide.
  • Keep a running snag list: chipped tiles, uneven plaster and doors that rub are easier to fix while trades are still on site.

Stage 8: Final inspection and handover

The final inspection happens once the work is complete and before the house is occupied. In England you notify building control within five days of completion, and the authority issues a completion certificate. Don’t move in, or make the final payment, until you have it.

  • Walk the house with the builder and agree a written snag list with dates.
  • Test every tap, drain, socket, switch, light, AC unit and the hot water.
  • Check outside: ground falling away from the walls, drains clear, gates and boundary walls finished.
  • Collect the documents below before the final payment.

What the inspection rules actually say

WhereWhat is required
United States (IRC R109)Footing (after excavation and steel, before concrete); foundation (before framing or backfill); plumbing, mechanical, gas and electrical rough-in (before concealment); frame (after the roof, framing and approved rough-ins); final (before occupancy). Many cities add insulation and others.
England (local authority building control)Notice at least 2 days before starting; at least 1 day before covering a foundation excavation, the foundation, any damp-proof course and the oversite concrete; completion notice within 5 days of finishing. The authority can make you open up work it wasn’t told about.
Everywhere elseAsk your municipality or building authority for its inspection schedule when the permit is issued. If no inspections are required, hire your own engineer to check the same stages.

Two important limits: official inspections check that work meets the minimum code, not your specification, and they are not full site supervision. A completion certificate is not a warranty either. That is why many owners also pay an independent inspector or engineer to visit at the same hold points.

Documents to collect before the final payment

  1. Approved drawings and any approved changes (variations).
  2. Inspection records and the completion certificate or occupancy permit.
  3. Electrical, plumbing and gas test certificates.
  4. Concrete delivery tickets and any structural engineer’s sign-off.
  5. Warranties for the roof, waterproofing, windows, AC and appliances.
  6. Manuals and service schedules for equipment.
  7. As-built drawings, or at least your labelled rough-in photos.

Five mistakes owners make

  • Paying by date instead of by stage. Tie each payment to a stage that has passed inspection.
  • Not seeing the rough-ins. Visit before every wall is closed, even if the inspector has approved it.
  • Verbal changes. Every change gets a written price and time before it is built.
  • No photos. Ten minutes with a phone at each hold point can save weeks later.
  • Moving in before sign-off. Insurance, utilities and resale can all depend on the completion certificate.

Simple tools for checking your own build

As an Amazon Associate, FitOnear earns from qualifying purchases. Links open Amazon search results. These help you spot problems; they don’t replace a qualified inspector.

START WITH THE SIZE

Every stage is priced from your built area. Get yours, including corridors and walls, from the free Home Planner, then print the brief for your builder.

Work out my built area →The full construction guide

Frequently asked questions

What are the stages of building a house?

Preparation and approvals, site preparation and setting out, footings, foundation and slab, walls, frame and roof, rough-in services, insulation and finishes, and the final inspection and handover.

What inspections are needed when building a house?

Typically footings before concrete, the foundation before backfill, rough-in plumbing, electrical, mechanical and gas before walls are closed, the frame, often insulation, and a final inspection before occupancy. In the US these come from the International Residential Code; elsewhere, ask your building authority for its list.

What should I check before the walls are closed?

Walk every room and check sockets, switches, lights, data and AC positions, kitchen and bathroom pipe positions, and that pressure tests have passed. Photograph every wall and ceiling, labelled by room, before boarding or plaster.

Is a building inspection the same as site supervision?

No. Official inspections check that work meets minimum building rules at set stages. They don’t supervise the builder or check your specification, and a completion certificate is not a warranty. Many owners hire an independent inspector or engineer as well.

When should I make the final payment to my builder?

After the final inspection or completion certificate, an agreed snag list, and handover of certificates, warranties and manuals. Tie every earlier payment to a completed and inspected stage rather than a calendar date.

Sources and standards

Sources checked November 2026. Inspection stages and notice periods differ by country and city, and they change: your building authority’s current list is the one to follow. This checklist is general guidance, not professional advice. Read how we plan and check our guides.

The FitOnear letter

One good home idea, every week

Layouts, courtyards, materials and planning tips for family homes. Free, no spam, unsubscribe any time.

Sent with MailPoet. See our privacy policy.

Get the Pinterest pin & social images

Ready-made graphics for this article: Pinterest 1000 × 1500; Facebook/X 1200 × 630. Download an image and add your own caption, or use the share buttons to open a composer.

What’s your home style?Take the 60-second quiz and get your colour palette →